ancona
Praying Mantis
We just got a call from a prime contractor we bid some work to, and it appears that we're going to be performing about 95% of the work in the flame trench at LC-39. This is a sweet pile of backlog work for us! We're also currently attending a pre-bid job walk inside the VAB at KSC. For the uninitiated, this is the largest single story structure on the planet. It has a five and a half acre footprint, and is so big that there are multiple three to four hundred foot towers inside housing operations. As a matter of fact, it actually has it's own weather inside. Clouds form starting at the four hundred foot level when conditions are right. If we can get competitive enough, that project alone would cover our overhead through next April. We'll see. 
